Sök:

Sökresultat:

2384 Uppsatser om Bole house construction - Sida 1 av 159

Ronningsgift

This thesis examines the sheep shed called Ronningsgift, and its historical functions and geographical location. The study aims to make a comprehensive gathering of the existing knowledge and to shed light on new theories about the history of Ronningsgift. This is done through desk research including literature and archive search, as well as an investigation and description of the construction and materials, and an interview. Further, I got the opportunity to take part of the results of two C14 samples from Ronningsgift. The literature and archive search shows that the most common theory of the historical function is as a guest house (g?ststuga/h?gstuga) or more traditionally called, Malst?ue/Malsteuvu.

Radon i betongkonstruktioner : - Kan det undvikas?

The following article consists of two parts; one part is about house construction and the other is a specialization about radon. The house construction part describes how to project a house from start. It contains the conformation of the house, the installations needed, calculations considering the strength of the construction, energy calculation and what materials were chosen. Calculations considering the costs of building and operate the house has been carried out. The result showed that the house would cost approximately two million Swedish kroner to build and thirteen thousand kronor a year to operate.

Passivhus ? lönsamhet och komfort

In this essay, we have compared a conventional house to a passive house. The housesshared the same local conditions; they have the same living area and the same layout. Thedifferences between the houses were the different construction solutions for the roof, theouter walls, the floor and the heating system. Both the houses qualify the standards fromBBR and the passive house also lives up to FEBY?s special conditions.The purpose with the essay was to examine if it really is profitable to build small hoses aspassive houses.

Analys av klimatskärmens lufttäthet i ett småhus

Together with NCC and Sweco we measured the air-flow on a semi-detached house in Jönköping. When a pressure measurement is made, the house gets exposed to over- and under pressure. This is done in order to examine the houses climate shell. The climate shell of the semi-detached house we tested exceeded the required air thickness in BBR-2002, hence, measures have to be taken.This report also displays the importance of building air thick houses and what consequences a non air-thick house can have for the ones residing the house. A discussion of different measures is on for the addressed problems with the flow-measurement and the alternative construction-solutions.Furthermore we have described in this report of how to account for the performance of the air pressure, what kind of equipment we used and how we came up with the results.

Det energisnåla isoleringsmaterialet

This bachelor essay is divided into two parts, the first being a construction of a single-familyhouse and the second an in-depth study of five different isolation materials, analysed from anenergy perspective.The first part, the construction of the single-family house, has been created from knowledgeacquired during three years of studying at KTH Royal institute of Technology in Stockholm, inthe program Architecture and the Built Environment. The constructed house is a one-floorhouse of 137m2with façade plaster, situated in Borlänge, Sweden. The house has a wooden framewhich is built on a on sight cast concrete foundation, on the ground. The house?s roof is a gableroof, which has an angle of 24 degrees.

Uppvärmningssystem - En analys av valmöjligheter för småhus

When constructing a new house many questions appear, from architecture to decisions regarding installations. Sweden is situated in a cold part of the planet and questions regarding which heating system to install face everyone who decides to build a new house. This thesis describes a construction solution of a villa in Kiruna. The extended essay analyzes which heating system is most suitable for the construction. The options are geothermal, district and pellet heating systems.

Prefabricerade Passivhus

European Union has made a new decision that all new built houses by 2020 shallbe near-zero energy houses. Boverket?s definition of near-zero energy housesintends buildings with good energy performance in which a proportion of theamount of energy that must be added to the building is made of renewable energy.Passive House is a set of requirements from FEBY designed to build energyefficient buildings. This is achieved by reducing loss of heat through the buildingenvelope and to take advantage of the passive heat from solar radiation,installation and heat sources like people living in the house.This project has been made with help of Anebyhus and one of their model houseshave been examined from the report?s issues, including Anebyhus?s energyperformance, requirements for the manufacturing and assembly, how theenvelope must be improved to fulfill the requirements for the Passive House andwhat energy calculation programs are available on the market.The report aims to provide solutions for energy efficient houses that are adaptedfor production of house building.Two visits to Anebyhus has been done to study their manufacture and assemblyof building elements.

Flexibel isolering av fönster för att minska energiförluster

The first part of this essay is about a single-family house that we have planned and projected. Thesecond part is a deeper study in ways to further insulate windows when they are not in use.In the first part the building?s design and its most important construction elements are described.The planning of all major installations (heating, domestic water, ventilation, sanitation, electricity)are reported so that one can in principle start construction of the house. In addition there arecalculations done on the building?s energy management.The result is a two stored house angled toward the south.

Allergifritt hus

This report consists of two parts, out of which the first deals with the planning and designing ofa small house in the Swedish city of Huddinge, using the weather conditions of the Swedish cityof Malmö. The house has to be in accordance with the Swedish building- and constructionregulations, as well as with the limitations in energy consumption given.The house itself has to consist of at least two bedrooms, and blueprints of the house, variousconstructional elements, ventilation, sanitation and electricity have to be drawn. Calculations ofthese aspects also have to be made, to ascertain that the different parts function as they should,and that the dimensions are sufficient.The second part is called ?Allergy free home?, and investigates how indoor climate affects us,and whether it has changed during the last few decades. It also makes an effort to see whetherthe increase of allergies and asthma is correlated with possible changes in indoor climate, andwhether technical solutions might help to handle or even decrease the issues arisen.

VISUALISERING AV KATALOGHUS -med ADT och VIZ Render

The aim of this final thesis is to make it easier for the customer of a new designed house to get a picture of what the house will look like inside before it has been built.A method, which can be applied by any construction company who likes to visualize there buildings, has been designed and tested. One works after a regular design planning which is transformed into a three dimensional model of the house. In a rendering program, materials and surfaces are chosen for the model and then a picture of the finished product is made. The programs used for this work are ADT 2006 and VIZ Render.To evaluate the use of this method I?ve chosen to cooperate with LB-Hus which is a housing company that is specialized in building detached houses.

Småhusproduktion : Utvecklingsmöjligheter hos JM AB

The Swedish building contractor JMRegion Öst would like to to investigatethe possibilities of developing andstreamlining the production of singlefamilyhouses. JM are producing singlefamilyhouses with prefabricated framesat a rate of about two houses per week.During construction, the different tasksare performed by JM?s own productionstaff but also by varioussubcontractors.When examining the schedules of recentlyproduced projects, it appears that allthe houses are more or less completedeight weeks before the customer moves into the house. During those eight weeksseveral operations are conducted such asinspections, installation of appliancesand cleaning procedures. The inspectionperiod constitutes between 25 and 35% ofthe complete construction period.By conducting interviews, it has beendiscovered that this final phase is anessential security buffer for delays anderrors that often occur.

Jämförelse av stenull- och polyuretanisolering : Brand- och fuktegenskaper i passivhuskonstruktion

This report compares two different types of insulation with regards to fire and moisture. The materials were tested for the company Fiskarhedenvillan AB, for a wall and a roof construction that the company currently uses in the establishment of Sweden's first certified passive house for international standards.Their current material, Rockwool, is compared to a relatively new material on the Swedish market called SEALECTION Agribalance sold by the company ISO Green AB. The material is a type of polyurethane insulation. This insulation material would result in a more efficient execution of the construction as it provides waterproofing and is applied more easily than Rockwool. From a fire standpoint, literature studies and discussions with fire experts led to results.

Brandsäkerhet i ett småhus

This essay includes the planning and designing of a house as well as writing a rapport about howto increase fire safety in small buildings.More than 6000 homes burn in Sweden every year (Brandskyddsföreningen, 2012c). Thedevastation and the costs are usually very high. This report examines possible measures to reduceboth personal injuries and economic losses resulting from house fires in small buildings.Swedishbuilding regulationsplay a major role when it comes to constructional fire safety. However therequirements inSwedish building regulations are very low for small buildings and this is anargument for raising the requirements.The report shows and describes possible methods to build safer with regards to fire in terms ofmaterials and different building structures. Major focus has been on fire cells but other solutionsare also examined and described.

Redesign of an existing apartment block in Kv Preussen to passive house

Passive houses are a relatively new concept in Sweden and by that it is meant a house without a traditional heating system. The most acknowledged passive house project is the terrace houses in Lindås, Gothenburg, which we have used as a reference. This project concerns a square apartment block. So far, no square apartment block has been built as a passive house in Sweden.The common opinion in the construction industry is that it is not economical to build extremely energy efficient houses. With Peab as commissioner our task was to investigate if that is true, if regarding the construction of a multi storey house as a passive houseMidroc, now owned by Peab, constructed in the block of Preussen in Jönköping during 2004-2005 four houses, with 132 apartments distributed on seven floors.

H&M och COS ? House of Brands eller Branded House

Utifrån varumärkesteorier undersöka vilka konsekvenser H&M´s beslut att lansera sitt nya varumärke COS som ett fristående varumärke utan någon synlig koppling till H&M har haft på konsumenternas uppfattning om varumärkena. Vi dragit slutsatsen att konsumenterna påverkas positivt av H&M´s val att övergå till ett House of Brands och lansera COS som ett fristående varumärke. Den osynliga, men samtidigt tydliga kopplingen är en viktig framgångsfaktor..

1 Nästa sida ->